Barton Advisory Group
Attending: Beth Siers, Kim Macwell, Elke Piontek-Ma, Christine Moulen, Darcy Duke, Rich Wenger (minutes).
1. Darcy plans to meet soon with the Systems OPAC staff to discuss next steps.
2. New servers
- Both new servers will run Solaris 9 and Oracle 9.
I. New test server
- Aleph was installed on walter-1last Fri.
- installation appears to be OK
- Most tables and script directories will be copied from grammy to the new test server.
- Christine has begun copying data and expects to be finished by the end of the week
- BAG members need to test all major functions after data synchronization to walter-1
- Christine will test speed of indexing in general and also parallel indexing.
- Christine hit a problem with p_file_03 on data export; some tables only partially dumped. Incident opened with ExL. (incident number?)
II. New production server should be ready for Aleph installation in early January
- we will need a couple days of downtime to synchronize data from (old) grammy
- Jan. 13-15 2006 is the tentative cutover date.
Next meeting: December 14 , 2005 1:30pm, Cubespace E25-131
Minutes: Duke