Minutes, 4/13/2005
Attendees: Jonah Jenkins (guest), Kim Maxwell, Rich Wenger, Beth Siers, Elke Piontek-Ma, Maria Rodrigues (guest), Georgiana McReynolds, Tracy Gabridge (minutes)
Training for the upgrade
Plans in Serials:
Tour will happen for processing folks who aren't currently involved in serials
testing on 4/27 at DIRC.
Kim's team is planning the training. Plan is to make the training staggered
rather than a day and a half "boot camp" session.
She will take care of her own scheduling needs.
Meeting time already adds up to 20 hours for serials people.
All documentation needs to be updated.
Acquisitions:
Charlene has been in touch with Maria and Jonah about training needs. Funds,
etc. training for staff will happen over the summer. All of Charlene's staff
are involved in testing, so there aren't any other staff training needs.
LTE Training:
Question: Who is taking care of this? (e.g. INI files, other client set up issues)
Circulation:
Three people will do the training. There are at least 22-25 people are circ
staff who will need training. There are many others who also need training that
work public service desks. There is a feeling that the training shouldn't be
local but rather provided system wide. Break the training into smaller sessions,
both an introductory module that all desk people will take as well as a more
indepth session that will cover advanced topics. Maria and Georgiana will discuss
separately. Maria will get a list together.
Cataloging:
Methods for training those who use the cataloging tab are under discussion.
Beth and cataloging testers will handle all cataloging training and scheduling.
About 15 people total will need this type of training.
Processing:
Training still under discussion.
Maria will be managing the master list of staff to ensure that everyone gets
the training they need.
Testing
Browse indexes are reset and are running now to clean up problems and fix normalization
issues.
Bib direct indexes are done and are fresh.
Issue with function keys - F4 - F8 are used for ALEPH shortcuts - there may
be a need to reconfigure what keys are used for term loan and other macros used
in various modules.
Circ testing
Underway. Testers need more time in the day to test. There are currently 8 people
testing (all from Circ Committee). Scripts and lists of things to test have
been distributed.
Loader testing
Some problems with p_manage_50 that have been reported this morning. This could
have major impact if it doesn't work properly.
Serials Acquisitions
Serial orders, problem with paying invoices. There is a problem report on this
issue.
OPAC
A problem report has been sent on the Forgot Your Password functionality
Indexing
p_manage_02 being run in a slightly different way, different parameters which
should mean we don't have to run p_manage_17. This should mean that the overall
indexing process will be shorter.
Communicating down time procedures to staff:
We need to create a variety of downtime plans for changing over to the new release.
It is possible that there will be a minimum of 4 days of downtime (in 2 2-day
chunks) to a maximum of 3 weeks in the worst case scenario. We need a dated
plan like we had during the original migration. Binding and processing will
be important stakeholders to involve. This item will be on the next agenda with
an output being an outline of downtime dates. This outline can then be put on
the BAG web site.
Item Descriptions and Publications schedule changes in version 16
We discussed changes to descriptions in Item records and the implications of
the disappearance of pub schedule records. Kim will summarize the changes for
the group, paying particular attention to the changes for the Web OPAC. Tracy
will include those OPAC changes in later communications about web OPAC changes
with version 16.